Scope of works:

The project involved the construction of an elevated covered walkway connecting the first floors of Buildings 1D to 3D. Additionally, two separate lift shafts and lifts were installed at designated locations within the school.

Access to the lifts has been fully integrated with the school’s existing security infrastructure, allowing compatibility with their current swipe card system.

Client
NSW Department of Education
Architect
Aurora Design
Project Value
$1,458,600
Status
Completed January 2025